MIDLAND LINKS PROJECTS
Our first midland links project, R9, was carried out in 1990 and since then we have been a vital part of numerous contracts on the area 9 partnering scheme. During 2010 we worked on three projects simultaneously, R157, R161 and College Road and managed to deal successfully with the heavy workload and fast changing nature of these contracts. At present we are working on the R153 which is a relatively small job and are due to commence work on the much larger R165 in the coming months.
The Midland Links projects are always demanding but also extremely rewarding. The programme of works can change daily meaning flexibility is a must, and the removal of the concrete is hard work for even the most talented operatives. It is our experience of completing these projects that has formed the ethos of the company, which is that we will always try to help our clients in any way we can, and has also enhanced the ability of our workforce who are now ready to tackle any type of removal.
WORK WITH US
We are always happy to make new connections,
so if you wish to work with us or simply want more information regarding Hydro Demolition, Surface Preparation and Tank Cleaning